Construction and Civil Memory glossary

Construction has its own vocabulary, and Demiton adds a small one of its own. This page defines both in plain language, with a link to the page that explains each one in full.


The memory model
TermWhat it means
Civil MemoryThe one continuous, sourced record of a civil job that every register, connector and surface feeds or reads from - from the public market through the award into your delivery. Demiton is built on it, but it isn’t a thing you buy on its own. See How your registers become one record.
RegisterOne kind of record, kept current in one agreed format, however many systems produced it - site diaries, timesheets, budget lines. It is the same idea as the plant register or drawing register you already keep. See What a register is.
Register contractThe published JSON Schema behind a register: the fields a record carries, which are required, their units, and an example. Every published contract is listed in the register contract reference, which carries the live count.
Ingest groupThe pipe that writes records into a register - a connector, a harvester, or a computed reconciliation. It carries the routing, entitlement and provenance for everything it writes. See Ingest groups.
ShelfThe earlier name for a register. See Register, above, and Registers.
ProvenanceWhere a record came from: which system, which connector, and which run wrote it. Provenance is stamped on every record, so an answer can always be traced back to its source. See Ingest groups.
EntityThe canonical thing a record is about - a worker, a project, an asset, an organisation. Records attach to entities rather than to system-specific IDs, so memory survives a system migration. See Memory.
The public market and delivery
TermWhat it means
OCDSThe Open Contracting Data Standard: the open schema Australian governments publish planning notices, tenders and awards under. It shapes the pre-award half of Civil Memory. See OCDS.
OCIDThe Open Contracting Identifier: the globally unique ID an OCDS release gives one contracting process. It is how Demiton follows a single job from planning notice through tender to award without confusing it with a similarly named package.
OC4IDSThe Open Contracting for Infrastructure Data Standard: the delivery record for work you have won and are delivering. It is produced only through a contractor-initiated, consented, audited emission - never by default. See OC4IDS.
Award seamThe point where a public tender becomes your private delivery project. Public market data (OCDS) hands off to your operational record when a pursuit is linked to the contract that was won.
Per-project P&LProfit and loss for one job: budget, actual cost, commitments, contract value and gross margin, drawn from your ERP and refreshed nightly. The register is profit_and_loss. See Registers.
SoR / schedule of ratesA client’s priced list of work items - the rates a contract is measured and paid against. In Demiton, a schedule of rates can be checked against tender drawings by independent measurement; see sor_verification in the register catalog.

Prequalification, compliance and commercial

Section titled “Prequalification, compliance and commercial”
Prequalification, compliance and commercial
TermWhat it means
PrequalificationA client’s or road authority’s process for deciding in advance which contractors may bid for which work and at what value. It is the eligibility lens that sits before the market, and the standing it declares is what Protection’s lapsed compliance disease watches. The stand-alone Prequalification surface was retired in September 2026.
NPSThe Austroads National Prequalification System, used across Australian road authorities to classify contractors. Your NPS standing is recorded as classifications and expiry dates against your schemes.
R / B / F / AThe four NPS classification families: R for road construction, B for bridge, F for financial capacity, and A for asphalt. Levels sit inside each family - R1 to R5, B1 to B4, and A1 to A4 - while the financial level is stated as a value such as F25.
RetentionMoney a client withholds from progress payments as security for defects, released under the contract. The retention_position register holds what is currently withheld on a job. See the register catalog.
Security of paymentThe legislation that gives a contractor a right to a payment schedule and adjudication when a claim is not paid on time. The payment_schedule register is defined for it; see the register catalog.
Obligations and protections
TermWhat it means
ObligationOne duty a published document places on you for a job, with its clause, its window and what happens if you miss it. Section 76 of Queensland’s BIF Act, a payment schedule within 15 business days of a claim, is one. See Obligations.
SourceOne of the seven places a job’s duties come from: contract, law, principal, approvals, counterparties, workforce, and your own commitments. A standard such as AS or ISO is not a source; it enters through the contract or principal that calls it up. See Obligations.
InstrumentOne published document inside a source: an Act, a regulation, a contract form, a principal’s specification, a permit. The Building Industry Fairness (Security of Payment) Act 2017 (Qld) is one instrument.
Obligation libraryThe public set of instruments and their obligations that Demiton reads, one file per instrument, each obligation cited to its clause. It lives in the demitonapp/registers repository, and anyone can propose an addition. It is not complete, and Demiton never says it is.
ProtectionOne obligation switched on for one of your jobs. It runs every day from the day it is switched on.
Protection typeHow a protection runs, one of four: watch (a window opens when something happens and its deadline is tracked), countdown (a fixed date, flagged at 90, 30 and 7 days), check (evidence that must exist is looked for on a cadence), threshold (a measure is tracked against the line it must not cross).
DiseaseWhich of the five a protection guards against: rework, missed claims, disputes, cost drift or lapsed compliance. It is set on the obligation, separately from the protection type. See The five diseases.
Ready stateWhether a protection can run today. When it cannot, the register it reads is empty, and it names the kind of system that would fill it (“your finance system”) before any vendor.
How Demiton behaves
TermWhat it means
MCPThe Model Context Protocol: the open protocol that lets Claude, ChatGPT or an IDE call Demiton’s tools. A connection lists four tools - ask_demiton, tell_demiton, instruct_demiton and switch_org. See MCP tools.
Simulation modeA dry run for any write. The workflow evaluates and logs exactly what it would write, and to which system, without changing anything. See Security and governance.
Register status: AvailableThe register is filled today from connected systems, uploads, or Demiton’s own public data.
Register status: DeclaredThe register and its contract exist, and it fills as soon as a source or feature produces its first record. A Declared register can legitimately be empty.
Register status: PlannedThe register is defined as a contract, ahead of the connector that will fill it.

Still unsure what a term means, or want it defined for your own systems? Ask us.