Compliance documents
Compliance documents is one of Demiton's published registers for Australian civil construction. Safety and compliance documents attached to projects or workers. Demiton keeps it current from the systems a contractor already runs and publishes the record's shape as a versioned JSON Schema, so the same question works whichever system produced the record.
Part of Safety in the register catalog.
- Register ID
compliance_documentsUse this name to ask for the register. The API calls it a shelf ID.- Each record is
- An eventSomething that happened at a point in time.
- Status
- AvailableFilled today from connected systems, uploads or public data.
- Data
- OrganisationPrivate to each organisation's own workspace.
- Version
- v1 (1.0.3)Current version.
Standards
This register's contract was designed against these standards and laws. Holding these records does not by itself certify compliance.
- ISO 19650Organization and digitization of information about buildings and civil engineering works, including BIM - Information management using building information modelling (Parts 1 and 2)
- ISO 14001Environmental management systems - Requirements with guidance for use
- ISO 45001Occupational health and safety management systems - Requirements with guidance for use
- ISO 9001Quality management systems - Requirements
- WHS Act and RegulationsModel Work Health and Safety Regulations (safe work method statements)
- Occupational Health and Safety Act 2004 (Vic)Occupational Health and Safety Act 2004 (Vic)
- ISO 19650Information management using building information modelling (Parts 1 and 2)
- ISO 45001Occupational health and safety management systems - Requirements with guidance for use
- ISO 9001Quality management systems - Requirements
- ISO 19650BS EN ISO 19650-2 UK National Annex
Connectors
Connected today
Demiton keeps this register current from these systems now.
- Assignar
- Azure AI Search
- Dropbox
- SharePoint
On the roadmap
Systems in the planned connector rollout that can fill this register. Partial means the system holds only some of its fields.
- HammerTech
- Mitti
- Oracle Aconex
- ProcorePartial
- SitematePartial
Fields
13 fields: 4 required, 9 optional.
Required
Every record carries these fields.
- projectText
Project the compliance document is attached to.
Example:
BWG-2025-001- external_idText
Stable identity of the source submission, shelf-qualified as
compliance_documents:<id>.Example:
compliance_documents:cd-8101-0142- occurred_atDate and time
Submission date/time; the evidence and retention clock.
Example:
2026-07-14T07:45:00Z- document_titleText
Name of the form/document as submitted (observed source key
form_title).Example:
SWMS - Traffic Control Emerald Street
Optional
Present when the source system records them.
- assetText
Plant/asset the document attaches to.
- workerText
Worker the document attaches to.
Example:
5501- summaryText
Composed prose description of the submission.
Example:
Safe Work Method Statement submitted for traffic control …- revisionText
Document revision/version identifier.
- expires_atDate
Document/credential expiry, where the document has one.
- source_refsGroup of fields
The originating system's own identifiers (
assignar_project_id,assignar_worker_id,assignar_asset_id) kept for reconciliation, rather than freezing one vendor's column names into the contract.- status_codeText
Document status/suitability, stored with the code set it comes from.
- document_typeText
Class of compliance document (SWMS / ITP / inspection / diary).
Example:
SWMS- financial_periodDate
The period the submission falls in, derived from
occurred_at.
Filed against
Records are indexed along these dimensions, so they can be asked for by any of them.
- Projectwhat the record is about, from
Always set - Workerwhat the record is about, from
When known - Financial periodcontext for the record, from
When known
Example record
A sample from Bridgeworks Group, Demiton's demonstration company. The values are illustrative; the shape is exactly what the contract describes.
{ "document_title": "SWMS - Traffic Control Emerald Street", "document_type": "SWMS", "external_id": "compliance_documents:cd-8101-0142", "occurred_at": "2026-07-14T07:45:00Z", "project": "BWG-2025-001", "source_system": "ASSIGNAR", "summary": "Safe Work Method Statement submitted for traffic control activities on Emerald Street.", "worker": "5501"}Use this contract
The contract is a standard JSON Schema (draft 2020-12) document, so any JSON Schema validator can check a record against it. Keywords starting with x-demiton- add Demiton's own meaning, such as units and requiredness, and validators ignore them.
https://docs.demiton.io/registers/compliance_documents/v1.jsonShow the full JSON Schema
Loading the schema…