Construction methodology is one of Demiton's published registers for Australian civil construction. Work method statements and construction methodology held as reference for a project. Demiton keeps it current from the systems a contractor already runs and publishes the record's shape as a versioned JSON Schema, so the same question works whichever system produced the record.

Part of Projects in the register catalog.

Register ID
construction_methodologyUse this name to ask for the register. The API calls it a shelf ID.
Each record is
A procedureA rule or method Demiton follows.
Status
AvailableFilled today from connected systems, uploads or public data.
Data
OrganisationPrivate to each organisation's own workspace.
Version
v1 (1.0.2)Current version.

Standards

This register's contract was designed against these standards and laws. Holding these records does not by itself certify compliance.

  • ISO 19650Information management using BIM (Parts 1 and 2)Australia · 2019 · public summary
  • ISO 14001Environmental management systems - Requirements with guidance for useAustralia · 2016 · clause 10.2 · paywalled, from a secondary description
  • ISO 45001Occupational health and safety management systems - Requirements with guidance for useAustralia · 2018 · clause 6.1.2.1 hazard identification; 6.1.2.2 risk assessment; 8.1 operational planning and control · paywalled, from a secondary description
  • ISO 9001Quality management systems - RequirementsAustralia · 2016 · clause 7.5 documented information · paywalled, from a secondary description
  • WHS Act and RegulationsModel Work Health and Safety ActAustralia · model law · clause ss 35-39 · public summary
  • WHS Act and RegulationsModel Work Health and Safety Regulations (safe work method statements)Australia · model regulations · clause reg 299 (SWMS for high risk construction work: identify the work, hazards, risks, controls and implementation); SWMS copy kept 2 years after a notifiable incident · public summary
  • ISO 45001Occupational health and safety management systems - Requirements with guidance for useInternational · 2018 (Amd 1:2024; revision adds explicit documentation of 6.1.2.2 results) · clause 6.1.2.1; 6.1.2.2; 8.1 · paywalled, from a secondary description
  • Health and Safety at Work Act 2015 (NZ)Health and Safety at Work Act 2015New Zealand · as at 5 April 2025 · public summary

Connectors

Connected today

Demiton keeps this register current from these systems now.

No system fills this register yet.

On the roadmap

Systems in the planned connector rollout that can fill this register. Partial means the system holds only some of its fields.

None planned yet.

Fields

8 fields: 4 required, 4 optional.

Required

Every record carries these fields.

titleText

The document's title / works name; also the record-identity fallback when the basename is absent.

Example: Emerald Street Rejuvenation - Pavement Reconstruction Met…

hazardsList

Actual hazards / risks only (not controls, not prose mentioning "risk")

source_pathText

Storage locator of the source document the record was extracted from.

Example: /sites/BridgeworksProjects/BWG-2025-001/ITP/Pavement_Reco…

method_stepsList

The ordered construction method — the sequence of actions the crew performs.

Optional

Present when the source system records them.

work_activityText

Short phrase naming the primary activity (e.g. a foundations or slope-stabilisation activity)

Example: Pavement reconstruction

sequence_notesText

One-to-three sentence summary of overall sequencing / staging.

Example: Works progress in 150m chainage sections, night works for…

plant_equipmentList

Plant / equipment items used, deduplicated.

source_file_nameText

Basename of the source document.

Example: Pavement_Reconstruction_Methodology_Rev2.pdf

Example record

A sample from Bridgeworks Group, Demiton's demonstration company. The values are illustrative; the shape is exactly what the contract describes.

construction_methodology.example.json
{
"hazards": [
"Live traffic adjacent to worksite",
"Underground services (water, telecommunications) within excavation zone",
"Plant/pedestrian interaction during pavement placement"
],
"method_steps": [
"Traffic control setup and site establishment",
"Saw-cut and remove existing asphalt pavement",
"Excavate and profile subgrade to design level",
"Place and compact select fill and sub-base layers",
"Place and compact granular base course",
"Prime and seal, then place asphalt wearing course",
"Reinstate kerb, signage and line-marking"
],
"plant_equipment": [
"Excavator 20t",
"Vibrating roller",
"Asphalt paver",
"Water cart"
],
"sequence_notes": "Works progress in 150m chainage sections, night works for asphalt placement to limit traffic disruption.",
"source_file_name": "Pavement_Reconstruction_Methodology_Rev2.pdf",
"source_path": "/sites/BridgeworksProjects/BWG-2025-001/ITP/Pavement_Reconstruction_Methodology_Rev2.pdf",
"title": "Emerald Street Rejuvenation - Pavement Reconstruction Methodology",
"work_activity": "Pavement reconstruction"
}

Use this contract

The contract is a standard JSON Schema (draft 2020-12) document, so any JSON Schema validator can check a record against it. Keywords starting with x-demiton- add Demiton's own meaning, such as units and requiredness, and validators ignore them.

Schema URL
https://docs.demiton.io/registers/construction_methodology/v1.json
Show the full JSON Schema

Loading the schema…

Talk to the team

Tell us what you run - your ERP, field, payroll and document systems - and we will show you the registers Demiton would fill from them, on your data, in a 30-minute call.

Book a 30-minute callStart free