Tender pricing verdict
Tender pricing verdict is one of Demiton's published registers for Australian civil construction. Demiton keeps it current from the systems a contractor already runs and publishes the record's shape as a versioned JSON Schema, so the same question works whichever system produced the record.
- Register ID
tender_pricing_verdictUse this name to ask for the register. The API calls it a shelf ID.- Data
- OrganisationPrivate to each organisation's own workspace.
- Version
- v1 (1.0.0)Current version.
Connectors
Connected today
Demiton keeps this register current from these systems now.
No system fills this register yet.
Planned
Systems in the planned connector rollout that can fill this register. Partial means the system holds only some of its fields.
None planned yet.
Fields
25 fields: 10 required, 15 optional.
Required
Every record carries these fields.
- stateText
Whether the activity is inside the band or in breach.
One of
inside,breach- currencycurrency
The currency of every amount on this record (
priced_amount,priced_unit_cost,committed_cost,actual_cost,forecast_to_complete,variation_amount), an ISO 4217 alpha-3 code. A record with no currency has no usable amount.- week_startDate
The Monday of the week the run measured.
- work_activityText
The activity measured.
- input_mismatchTrue or false
True when the tendered rate or norm differs from that version by more than 2%.
- variation_basisText
Where variations were netted: the job, or the activity.
One of
job,activity- weeks_in_breachWhole number
Consecutive weeks the activity's ratios have been outside the band.
- evidence_fact_idsList
The facts the measurement read: the price, the map, the cost and progress facts.
- project_entity_idWhole number
The project measured.
- input_version_basisText
How the version was chosen: by the tender's date, or none in force.
One of
dated,none
Optional
Present when the source system records them.
- causeText
The largest positive cost effect; absent when none is positive.
One of
rate,norm,quantity,preliminaries,escalation,bought- qty_ratioNumber
Quantity built over quantity priced; absent when either is.
- norm_ratioNumber
Hours per unit achieved over hours per unit priced; absent when either is.
- priced_qtyNumber
The tendered quantity.
- rate_ratioNumber
Rate paid over rate priced; absent when either is.
- actual_costNumber
Posted cost, over the mapped cost codes.
- complete_pctNumber
The share of the activity complete, from 0 to 1.
- priced_hoursNumber
The tendered hours.
- input_versionWhole number
The
tender_inputversion in force on the tender's date, or absent when there was none.- priced_amountNumber
The activity's tendered total.
- committed_costNumber
Open orders not yet received, over the mapped cost codes.
- skipped_reasonText
Why the activity could not be measured; required when it could not.
One of
no_price_linked,no_confirmed_map,no_actuals,variation_job_level- priced_unit_costNumber
The tendered rate per unit of quantity.
- variation_amountNumber
Accepted variations netted out, at the level
variation_basisnames.- forecast_to_completeNumber
The position divided by
complete_pct, floored at the position.
Use this contract
The contract is a standard JSON Schema (draft 2020-12) document, so any JSON Schema validator can check a record against it. Keywords starting with x-demiton- add Demiton's own meaning, such as units and requiredness, and validators ignore them.
https://docs.demiton.io/registers/tender_pricing_verdict/v1.jsonShow the full JSON Schema
Loading the schema…