On a Queensland road job the number is 97 per cent. TMR’s earthworks specification, MRTS04, sets that as the minimum compaction for earth fill in the top 300 mm below subgrade, measured across the lot rather than on one test. The site engineer wants the next layer down today, because the crew and the roller are paid for whether they work or not. The lab result for the layer underneath comes back the next morning. If it fails and the next layer is already on, the engineer now owns two layers: the one that failed, and the one that has to come off to reach it. Rework is not the failed test. It is everything built on top of the failed test before anyone read it.

What it is
Work done twice: failed inspections, NCRs, wrong ground assumptions.
The protection
The failed result reaches the person who can stop the next stage the day it lands, with the close-out date attached.
Running today
Every NCR, test result and plant pre-start lands in one register, tied to the location and the crew - so the pattern shows up before the same defect gets poured twice.

Every rework verdict is filed under one of five causes: the stage or control that failed. They come from the same vocabulary the product uses, in the order the app’s disease page shows them.

CauseWhat it covers
Design and documentationWrong, late, incomplete or superseded design; clashes; unclear specification; an unanswered RFI.
Scope and changeA requirement changed after work was committed: client or end-user change, variation, design change, a latent-condition instruction.
Planning, procurement and sequencingWrong quantity or type bought, repeat orders, over-order, wrong method or sequence, temporary works, long-lead material.
Setting-out, ground and external conditionsWrong level or position, survey error, service strike, ground not as recorded, weather or external damage.
Workmanship and quality conformanceWork not to specification: failed test, NCR, ITP or hold-point failure, non-conforming work, punch list, defective material installed.

The rework check runs once the organisation holds:

These registers add evidence to a rework verdict. Each linked name is a published register contract.

Talk to the team

Tell us what you run - your ERP, field, payroll and document systems - and we will show you the registers Demiton would fill from them, on your data, in a 30-minute call.

Book a 30-minute callStart free